Tiffin · Canada · Crit
Tiffin Phaeton: Engine
Affects Tiffin Phaeton · 2010–2012 — about 10 vehicles.
The hazard
On certain vehicles built on a Powerglide chassis, insufficient clearance exists between the exhaust pipe and the floor. This could cause the floor insulation to melt and make the floor area above the engine extremely hot, increasing the risk of personal injury or possibly resulting in a fire. Correction: Dealers will install a revised exhaust configuration to increase clearance.
What to do
Contact your dealer; the remedy details were not included in the filing.
Critical — crash/injury risk now
High — injury risk; see remedy
Moderate — fix at next service
Low — minor / informational