SYS ONLINE INGEST 5 hours ago SOURCE NHTSA · TC BUILD v0.0.29
Vehicle scope Default: all classes — narrow to retail passenger anytime

Thomas Built · Canada · Crit

Thomas Built Mvp-Er School Bus: Electrical

Affects Thomas Built Mvp-Er School Bus · 1995–2002 — about 10 vehicles.

The hazard

On certain vehicles, un-fused power cables were fastened to a fuel return hose during vehicle assembly. Over time, these cables may chafe, wearing through the wire loom and eventually through the cable insulation and fuel line covering. This could cause a short circuit, which could result in a fire. Correction: Dealers will inspect the cable, and replace as necessary.

What to do

Contact your dealer; the remedy details were not included in the filing.

Critical — crash/injury risk now High — injury risk; see remedy Moderate — fix at next service Low — minor / informational